Categories: Travel

This abandoned railway is transforming into a trail across four Ontario cities

A long-abandoned railway corridor that once carried trains through parts of Peel Region is getting a new lease on life as a 51-kilometre recreational trail connecting multiple Ontario communities.

The former Orangeville-Brampton Railway corridor, which was decommissioned in late 2022, is being transformed into a multi-use trail stretching through Mississauga, Brampton, Caledon, and Orangeville as part of a multi-year regional project.

In 2022, the four regions jointly acquired the former corridor with plans to convert it into a public trail network.

In Brampton alone, the future trail will stretch more than 14 kilometres along the former rail corridor, which the city purchased for $24.25 million.

City officials say the project is designed to create more connected and sustainable public spaces while encouraging walking and biking, a welcome change for what is currently an abandoned railway track.

Photo via City of Brampton.

Since multiple municipalities have joined forces on the project, coordination between all regions will be key to ensuring its successful completion. The City of Brampton is currently in Phase 1 of the project, focusing on “visioning” and public outreach.

Caledon is expected to play a major role in the transformation, with the town overseeing roughly 36 kilometres of the corridor within its boundaries, the largest portion among the municipalities involved in the project.

Caledon officials say the project is intended to connect communities across the town and neighbouring municipalities while supporting key pillars of the community, including tourism, economic development, and outdoor recreation.

The trail could eventually continue north beyond Orangeville toward Owen Sound, creating a larger regional recreation corridor, officials add.

The Town is currently in Phase 2 of the project, which includes preliminary design work, public consultation, and environmental and safety studies.

Photo via City of Mississauga.

Mississauga is also moving ahead with its portion of the conversion project, where a shorter 1.15-kilometre section will run from Atwood Lane to the Brampton border across the Credit River. Construction on that section is expected to begin in the fall of 2026, with the trail planned to open in Summer 2027.

Photo via City of Mississauga.

Once complete, the revitalized route is expected to connect with other trail systems across the region, including parts of the broader Credit Valley Trail network.

Recent posts:
Canada’s largest South Asian festival returns to Mississauga next month
Toronto’s waterfront is about to come alive with free concerts all summer long

Recent Posts

Here’s what to know before visiting Elk Island National Park in Alberta

You can take a closer look at the bison in Alberta!

48 minutes ago

This Alberta town transforms into a pumpkin-filled wonderland every fall

Some Alberta towns are known for their mountains, others for their lakes, but Smoky Lake…

2 hours ago

Toronto’s beloved ‘haunted castle’ is unleashing new spaces and larger-than-life scares

A Toronto castle that supposedly harbours some spirits of its own has been transforming into…

4 hours ago

Here’s where to get TIFF-ready in Toronto

TIFF is here, which means Toronto is about to be filled with red carpets, premieres,…

20 hours ago

10 Calgary burger spots serving up some of the city’s most stacked creations

Some burgers are easy to pick up with one hand, while others require a little…

21 hours ago

10 of the best things to do in and around Vancouver this weekend (Sept. 11-13)

Don't let the mixed forecast keep you down, Vancouver. There are tons of live music…

21 hours ago